← 全部框架All frameworks正在预览框架Previewing framework: Redline Mono (第 35 / 37 个)(35 of 37)‹ 上一个Previous下一个Next ›
Home / Products / EDM & Plastic Parts / CNC Machined Engineering Plastic Parts
EDM & Plastic Parts

CNC Machined Engineering Plastic Parts

Model / Ref: APX-E602

POM, PEEK, nylon and PTFE parts machined for insulating, low-friction and food-contact applications.

  • FDA-grade materials
  • No mould cost
  • Stress-relieved stock
MaterialPOM, PEEK, PA66, PTFE, PC, UHMW-PE
Tolerance±0.02 mm
Surface finishAs machined, polishing
ProcessCNC milling & turning

Specifications

MaterialPOM, PEEK, PA66, PTFE, PC, UHMW-PE
Tolerance±0.02 mm
Surface finishAs machined, polishing
ProcessCNC milling & turning
Drawing formatsSTEP, IGES, DWG, PDF
InspectionCMM, projector, height gauge, FAI report
MOQ1 pc (prototype) / 500 pcs (production)
Lead timeSamples 5–7 days, mass production 15–25 days

Product Details

POM, PEEK, nylon and PTFE parts machined for insulating, low-friction and food-contact applications.

Manufacturing process

Every order starts with a DFM review by our engineers. Parts are machined on calibrated equipment, inspected in-process and 100% visually checked before packing. Critical dimensions are measured on CMM and reported in a first article inspection (FAI) report.

Why buyers choose us

  • Quotation within 24 hours, samples in 5–7 days
  • MOQ from 1 piece for prototypes
  • Material certificates, RoHS / REACH on request
  • Export packing and door-to-door shipping

FAQ

What files do you need for a quote?

STEP / IGES 3D files plus a PDF drawing with tolerances, material, finish and quantity. We sign NDAs on request.

What is the lead time?

Samples typically ship in 5–7 working days; production orders in 2–3 weeks depending on quantity and finishing.