← 全部框架All frameworks正在预览框架Previewing framework: Azure Studio (第 30 / 37 个)(30 of 37)‹ 上一个Previous下一个Next ›
ISO 9001:2015 certified CNC machining factory · Quotes within 24 hours ✉ sales@apex-precision.example☎ +86 512 5790 8866WhatsApp
Home / Products / Sheet Metal Fabrication / Welded Steel Frame Fabrication
Sheet Metal Fabrication

Welded Steel Frame Fabrication

Model / Ref: APX-S304

Structural frames, racks and machine guards fabricated from tube and plate, welded and powder coated.

  • Frames up to 6 m
  • Certified welders
  • Machining after welding
MaterialQ235 / S355 steel tube and plate
Tolerance±0.5 mm
Surface finishSand blasting, primer, powder coating
ProcessSawing, laser cutting, MIG/TIG welding

Overview

Structural frames, racks and machine guards fabricated from tube and plate, welded and powder coated.

Manufacturing process

Every order starts with a DFM review by our engineers. Parts are machined on calibrated equipment, inspected in-process and 100% visually checked before packing. Critical dimensions are measured on CMM and reported in a first article inspection (FAI) report.

Why buyers choose us

  • Quotation within 24 hours, samples in 5–7 days
  • MOQ from 1 piece for prototypes
  • Material certificates, RoHS / REACH on request
  • Export packing and door-to-door shipping

Specifications

MaterialQ235 / S355 steel tube and plate
Tolerance±0.5 mm
Surface finishSand blasting, primer, powder coating
ProcessSawing, laser cutting, MIG/TIG welding
Drawing formatsSTEP, IGES, DWG, PDF
InspectionCMM, projector, height gauge, FAI report
MOQ1 pc (prototype) / 500 pcs (production)
Lead timeSamples 5–7 days, mass production 15–25 days

FAQ

What files do you need for a quote?

STEP / IGES 3D files plus a PDF drawing with tolerances, material, finish and quantity. We sign NDAs on request.

What is the lead time?

Samples typically ship in 5–7 working days; production orders in 2–3 weeks depending on quantity and finishing.

Get a quote for this part

Send your drawing, material and quantity. An engineer replies within one working day.